Page 26 - Electro-Wind Brochure 2024
P. 26

 Case Studies
   Part A – Specification Data
Input volts (on-load) 11000V 3ph (3 wire) @ 86A
 Output volts A (on-load) 2 x 500V 3ph (3 wire) @ 941A
 Ingress Protection BS EN60529 IP00
 Frequency – Hz. 50 / 60 Hz
 Type Dry
 Vector Group Dd0yn11
 Screen between HV/LV windings Yes
 Ambient Temperature Degrees C 30°c
  Impedance Voltage (%) 7%
 Primary Tapings ± 2.5 & 5%
 Duty Cycle Continuous
 Commulating Impedance (%) 7.3% (balanced to 10% between windings)
 Total loss @ nominal voltage/ freq. TBA
 Dielectric Class 28 kV
 Insulation Class (Temp. rise) H
 Winding Conductor Material TBA
Item Data Option A
Part B – Fittings
 Quantity 1
 Rating 1630 kVA
 Enclosed (Medium grey) IP22
 Height (mm) Approx. H 2000
 Length (mm) Approx. L 2000
 Depth (mm) Approx. W 3000
 Weight (kg) Approx. 5000
 Connection Bushings / Cu bus bar flags.
 Protection Not requested
 Notes For use with regenerative 12 pulse thyristor drive to start and run a DC motor
Not oversized for input harmonics or any other factor not shown on the quote
 Standard BSEN 60076
Part A – Specification Data
volts (on-load) 520VDC
 Input 1150A DC (from 6 pulse)
 Output 2300A DC (12 pulse)
 Ingress Protection BS EN60529 IP00
 Frequency – Hz. 300 Hz
 Type An (dry)
 Phases 6 / 12
 Ambient Temperature Degrees C 30°c (peaks of 40°c)
  Winding voltage at 300Hz 588V Pk to Pk Trapezodial Wave
 Maximum DC imbalance current 230A DC
 Tapings (MV) None Requested
 Duty Cycle Continuous
 Noise Emission dB(A) (Lpa) N/A
 Dielectric Class 3kV
 BIL/Separate Source Withstand N/A
 Insulation Class (Temp. rise) H
 Winding Conductor Material TBA
Item Data Option A
Part B – Fittings
 Quantity 1
 Inductance (L) 2.0 mH maintained for 10% of ADC
 Rating 2300ADC
 Enclosed (Medium grey) Open
 Height (mm) Approx. A 700
 Length (mm) Approx. B 600
 Depth (mm) Approx. C 500
 Weight (kg) Approx. 350
 Connection Copper busbar flags (to be confirmed)
 Protection Not requested
 Overload Not oversized as values NOT advised
 Standard BS 60076
 At Electro-Wind, we pride ourselves on exceeding Customer expectations, delivering on time and within budget.
 Page 26
 Aircraft Research Association Ltd. 12 pulse Hexaphase transformer & IBR Upgrade to drive system on Transonic Wind Tunnel.
  































   24   25   26   27   28